Plan for Week of March 3
Unfortunately, there was miscommunication and we were not able to meet with Professor Johnson last week to discuss our project. However, we have resolved our configuration issues and we are all able to acess and modify the code. We have the model for the discipline and interest tree working. In addition, publications are close to being done as well.
Plan for Week of February 25
We were not able to have a meeting last week with the client. We have had trouble getting the VM for development. This is due to the fact that the Scholar Network is hosted on a system owned by a group member that left. Hopefully, we will have the appropiate configurations soon so that we can proceed further. We plan on implementing the top 5 features requested by the client, despite the current issues.
Plan for Week of February 18
The css is complete. We are currently working on getting a VM for development.
Plan for Week of February 11
The interest tree is nearly complete. Last week, we had no meetings with the client. Our meetings pick up again this week. At our next meeting, we will be giving a presentation of our progress which will definitely include the interest tree.
Plan for Week of February 4
We have a scheduled out the first month of coding that needs to be done. We have been given detailed requirements on what the Scholar Network needs to contain. We have also been given the taxonomies. We still need a more complete schedule. Coding has begun in full force and will most likely continue for the rest of the semester. Our client is currently out of town so we have not met in 2 weeks.
Plan for Week of December 3
We have scheduled a meeting with our on campus contact for this Tuesday. We will meet with him and show him a presentation. We will have him review our Requirements Document so that we can make it more specific. Not everyone in our group has access to our client's server, so we will continue to speak with our client about this.
Plan for Week of November 26
We plan to have a meeting with both of our clients and finish up the individual presentations for our group.
Plan for Week of November 19
Thanksgiving Break
Plan for Week of November 12
We familiarized ourselves with CGML, Common Ground's own markup language. Unfortunately, due to exams, we were unable to have our weekly meeting. However, we have two meetings this week. We hope to solidify the requirements document more and continue working on the next phase of development.
Plan for Week of November 5
We had our weekly meeting with our sponsor via Skype. We have uploaded the initial project into the respository, and are staged for more development. We also plan on continuing to flesh out the requirements document as much as possible. Furthermore, we plan on starting the next phase of development as stated on the requirements document.
Plan for Week of October 29
We met last week with our sponser via Skype. This week, we will continue our weekly meeting with Liam. In addition, we will initiate weekly meetings with Bill Cope. We also plan on continuing to flesh out the requirements document as much as possible.
Plan for Week of October 22
Monday, October 22
We plan to revise the requirements document with some added specifications. We also plan to start a weekly Skype meeting with our sponser. The time for those meetings is still undetermined. We also plan to move ahead and start working on the first draft of the project. The details of the draft is in the requirements document in the menu.
Plan for Week of October 15
Monday, October 15
We have the final version of our requirements document. We also have a rough sketch of the first draft of the Scholar Network project. This week, we plan to have a meeting with our sponser via Skype and continue developing our application.
Plan for Week of October 8
Monday, October 8
This week we are going to add more detail to our requirements document. We also plan to meet with our sponsor via Skype. This week everyone in our group should have access to the Trac and SVN provided by Common Ground.
Plan for Week of October 1
Monday, October 1
The requirments gathering process will continue. We had another meeting last week with Bill Cope who works for Common Ground at Research Park. We wil familiarize ourselves with Ruby on Rails. We will also begin to sketch out the framework of the application.
Plan for Week of September 24
Monday, September 24
We will meet with our sponsor this week on Tuesday at 5pm. We have access to the SVN and Trac now. We will continue to work on our Requirements Document and begin the foundation of our application.
Plan for Week of September 17
Monday, September 17
We plan to meet with our sponsor this week to go over progress and obtain more details about our project. We also plan to have a draft of our requirements document.
Meeting with Sponsor
Tuesday, September 11
We met with Liam at Empire around 6pm. Our detailed notes can be found on our "Notes" page.
Plan for Week of September 10
Monday, September 10
We plan to meet with our sponsor this week. We will also create a semester schedule.
Plan for Week of September 03
Monday, September 03
We attempted to contact our sponsor. We are currently waiting for a response to set up our first meeting. Rosemary and Patrick will begin website development.